Technology

 
Automatization Hot Roll Finishing Line Automatic Control Technology of WISCO
 

The most advanced finishing automatic control software technology for the current automatization level developed by WISCO has been applied to WISCO No. 2 Hot Roll Plant which has the first finishing hot roll production line in China.

Indicated as the system configuration drawing, Model PC is a model machine, Leveller1 PC is 1# straightener PC, Leveller2 PC is 2# straightener PC, online PC is strip steel job step PC, namely control the electrical equipment(except 1# straightener, fly shear) from decoiling machine to fly shears. Offline PC panel job step PC, namely control the electrical equipment (except 2# straightener) from fly shears back to steel plate piling table. Sheer PC is fly shear PC, specially used for control the fly shear. The basic automatization adopted 3 sets of SIEMENS S7-400 PLC, Leveller PLC is used for controlling 1# and 2# straightener, online PLC is used for controlling electrical equipment from decoiling machine to fly shear, offline PLC is used for controlling the electrical equipment from fly shears back to steel plate piling table.

FM458 application function processor used by the system is a controller with multiple functions and stable performance, appropriate for the rapid and complex control missions: for example, the position inspection, position calculation, position control, logic interlocking and operation.

Computer System Configuration Drawing

The finishing automatic control system has been operated till today, the finished product plate tolerance and shape entirely satisfy the contract requirement, the product can’t meet the demand; Since the operation of the system for 3 years, it symbolizes the maturity and reliability of cross-cut line automatization control system, which has brought in excellent economic benefit to the enterprise.

Application example: WISCO No.2 Hot Roll Plant

 
Back